EAL Typical Pricing

An estimate of the costs associated with the services we offer!

Prices listed are based on a typical range. Actual price varies by site, site conditions, client requirements. Pricing in Canadian dollars, taxes extra. All work assumes unfettered site access. Pricing estimates represent total cost of EAL and supplier cost combined. Suppliers and EAL to be paid 50% in advance and 25% on day of field work, 25% prior to report delivery. Project estimates are developed according to project scope and variables. Call for a custom quote tailored to your situation.

Alternative Energy

  • Geothermal - Vertical Wells $2 100.00

    Desktop study

  • Geo-Electrical - Vertical Wells $27 000

    Desktop study

  • Geothermal Report - FTC $2 500

    Using client-provided data

Civil Engineering

  • Site Visit - Greater Toronto Area and London, ON $1 100.00

    4 hours, includes travel within GTA or London, ON
    First meeting to review plans and issues on site including Geotechnical, Environmental Assessments, Civil Engineering, Utilities Review, Environmental Compliance, Storm and Ground Water Options, Alternative Energy, Seismic Site Class Evaluation

  • Site Visit - Elsewhere in Canada Request a Quote

    Outside of the GTA, including remote locations.

  • Daily Email Report $800

    1 remote reading monitor review

Environmental Assessments

  • Phase I Assessments $13 000 to $15 000

    (personal use to record of site condition use)

  • Phase II Environmental Assessments $5 000 to $100 000

    (Personal use limited testing to record of site condition use)
    Clients pay all subcontractors (drillers, labs, title searches, government search fees etc.)

  • Other Assessments Available Request a Quote

    • Phase Three Environmental Site Assessment
    • Record of Site Condition
    • Risk Assessment
    • Contaminated land assessments
    • Contaminated water assessments
    • Underground fuel tank investigation
    • Degreaser delineation
    • Soil sampling

Environmental Compliance

  • Forms for Canadian Banks and Government $5 000 or more

    Planning, Purchase, Mortgage Application etc.

Movement Measurement

  • Small Movement Monitoring (1 Unit, Non-Electric) $3 200

    1 install, 1 de-install, 1 month in place, letter report

  • Vibration Movement of Moving platform, x,y,z $55 500

    1 day, using existing equipment

  • Construction Related Movement Measurement $4 800

    Field day and daily letter report

Seismic Site Class Evaluation

  • Seismic Site Class - REMI $2 500 to over $10 000

    2 line, 30m seismic

Storm and Groundwater Options

  • Storm Water Analysis, Aquifer Recharge, Flow Reduction, Pollution Reduction $3 000 to over $30 000

    Desktop study re: SAGES™ or other

Utilities Review

  • Functional Site Services Report $2 750 to over $30 000

    Desktop study to review utilities (water, storm, gas, sewer, power) to assist in project pre-planning

Prices listed are based on a typical range. Actual price varies by site, site conditions, client requirements. Pricing in Canadian dollars, taxes extra. All work assumes unfettered site access. Pricing estimates represent total cost of EAL and supplier cost combined. Suppliers and EAL to be paid 50% in advance and 25% on day of field work, 25% prior to report delivery. Project estimates are developed according to project scope and variables. Call for a custom quote tailored to your situation.

Ready to find out how Egmond Associates can benefit you?

Contact us today to schedule a consultation or to learn more about our services.
Scroll to Top